Bidev Consulting Logo
About
Traçabilité aéronautique et conformité EN 9100
AERONAUTICS & METALLURGY

Material Traceability
100% Digital

Manage your batches, quality controls and EN 9100 compliance from a single platform. No more Excel files and stressful audits.

Request a free diagnostic →
The challenges of aeronautics traceability

Between EN 9100 requirements, material traceability and non-conformance management, quality and production teams are under constant pressure.

Your daily challenges

!

Fragmented batch tracking

Between Excel, paper and aging ERP, traceability is an obstacle course.

!

Time-consuming audits

Preparing an EN 9100 or NADCAP audit ties up your teams for weeks.

!

Non-conformances resolved too slowly

NC processing takes too long and directly impacts production.

!

Lack of real-time visibility

No consolidated view of the production chain. Decisions are made blindly.

Our support

Custom SaaS solutions and consultants embedded in your teams

End-to-end traceability

Every batch tracked digitally, from raw material to finished product with complete history.

Automatic audit trail

Built-in EN 9100 and NADCAP compliance. Every action tracked and timestamped.

Automated NC management

Complete workflow: detection, analysis, corrective action, verification. Turnaround time divided by 3.

Real-time dashboards

Production, quality and maintenance KPIs accessible in one click. Informed decisions.

-70%
audit preparation time
100%
digital traceability
×3
faster on NCs
EN 9100 NADCAP ISO 9001 ISO 14001
Batch traceability
Quality control
Maintenance
Audit trail
Non-conformances
Material tracking
Production KPIs
Document management

Ready to digitize your aeronautics traceability?

Free audit of your quality processes within 48h

Request a diagnostic →
Material traceability

End-to-end traceability: from raw material to finished product

Every batch is tracked digitally from raw material to finished product. The complete traceability tree is accessible in one click, with material certificates, transformation history and automatic alerts in case of anomalies.

  • RFID / barcodes — unique identification of each batch, part and raw material via RFID, barcodes or QR codes for seamless tracking
  • Traceability tree — complete visualization of a batch's genealogy: incoming materials, transformation operations, controls and destinations
  • Material certificates — automatic linking of supplier certificates (3.1, 3.2) to each batch with digital archiving and instant search
  • Real-time alerts — immediate notification in case of traceability break, blocked batch, missing certificate or anomaly detected in the chain
1
Diagnostic

Mapping of existing material flows, identification of traceability break points, definition of the target model

1 to 2 weeks
2
Design

Technical architecture, functional mockups, pilot on a limited scope and validation with your quality teams

2 to 4 weeks
3
Development

Iterative development: traceability, ERP/MES connectors, quality controls, material certificates and audit trail

8 to 14 weeks
4
Deployment & Support

Production deployment, team training, monitoring, ongoing support and iterative improvements

Ongoing
Regulatory compliance

Audit & compliance: EN 9100, NADCAP, ISO

Preparing an audit should not tie up your teams for weeks. Our platform automatically generates the complete audit trail, centralizes documentation and ensures continuous compliance with aeronautics standards.

  • Automatic audit trail — every action, modification and validation is automatically tracked and timestamped, without manual intervention
  • EN 9100 audit preparation — pre-built audit files with compliance evidence, quality indicators and corrective action history
  • Document management — centralization of procedures, quality plans, control sheets and certificates with versioning and validation workflow
  • Compliance dashboard — real-time view of compliance level by process, with alerts on deviations and regulatory deadlines
Quality controlsSPC, metrology, validation
Audit trailTracked & timestamped actions
DocumentationProcedures & certificates
▼ ▼ ▼
BiDev Compliance EngineEN 9100 · NADCAP · ISO 9001 · ISO 14001
▼ ▼ ▼
ComplianceLevel by process
ReportsPre-built audit files
AlertsDeviations & deadlines
Quality & NC

Non-conformance management: automated workflow

Non-conformances not addressed quickly are costly in terms of production and credibility. Our PDCA workflow automates the entire cycle: detection, root cause analysis, corrective actions and effectiveness verification.

  • Automatic detection — automatic escalation of NCs from quality controls, customer returns and internal audits with classification by criticality
  • PDCA Workflow — integrated Plan-Do-Check-Act cycle with automatic assignment of owners, deadlines and reminders
  • Root cause analysis — integrated analysis tools (Ishikawa, 5 Whys, 8D) to identify and address root causes, not just symptoms
  • Corrective action tracking — dashboard of ongoing actions, effectiveness verification and formal closure with documented evidence
1
Detection

Automatic escalation from controls, customer returns or audits

Auto
2
Cause analysis

Ishikawa, 5 Whys, classification by criticality

8D
3
Corrective action

Action plan with owner, deadline and validation

PDCA
4
Verification

Effectiveness check and documented evidence

Alert
5
Closure

Formal closure with complete audit trail

Audit
Real-time monitoring

Production dashboards: Real-time KPIs

No more blind decisions. Our dashboards centralize production, quality and maintenance data to provide a consolidated and actionable view of your industrial performance.

  • Real-time OEE — overall equipment effectiveness calculated continuously by line, machine and workshop with loss breakdown
  • Preventive maintenance tracking — planning and tracking of maintenance interventions with deadline alerts and complete equipment history
  • Quality indicators — scrap rate, rework rate, customer PPM, cost of non-quality and trends with targets and alert thresholds
  • Alerts and notifications — automatic triggering of alerts in case of quality drift, machine breakdown, production delay or threshold breach
100%
Traceability
Batches tracked digitally
-70%
Audit time
Automated preparation
×3
NCs resolved
Automated PDCA workflow
0
Open NC >30d
Automatic reminders
-70%
Preparation time
EN 9100 audit
100%
Traceability
digital batch tracking
×3
Faster
NC resolution
0
Break in
traceability
The tools we master and integrate

In-depth knowledge of the aeronautics and metallurgy industry's technology ecosystem, acquired in the field.

SAP

SAP / ERP

Production management, procurement, inventory and batch traceability

GPAO

Manufacturing orders, operation sequences and planning

Quality Control

SPC, metrology, control plans and validation

MES / SCADA

Real-time machine data, OEE and line management

GED / EDM

Technical documentation, drawings, certificates and procedures

Python

Python

RAD, dashboards, workflows and business integrations

GMAO

Preventive and corrective maintenance and parts management

Traceability

RFID, barcodes, QR codes and material identification

Return on investment concrete

Before/after comparison on key processes of an aeronautics production site.

On average, preparing an EN 9100 audit requires 3 to 5 days of a quality team. With a digital platform, this time drops to 2 to 4 hours.

Concrete ROI for your site

Indicator
Before
With BiDev
Audit preparation
3 to 5 days
2 to 4 hours
Quality control data entry
15-20 min / form
3-5 min / form
Traceability lookup
Manual search
1 click
Quality indicators
D+1 (manual reporting)
Real-time

Does this sound like you?

If you check 3 of these 5 warning signs, it's time to take action.

What our clients ask us

How long to become operational?

The pilot is launched in 4 to 8 weeks. The majority of our aeronautics clients are fully operational in 36 to 48 weeks, including team training.

Is the solution compatible with our existing ERP?

Yes. We perform integrations with SAP, Sage, MES and any system with an API or data export capability. No disruptive migration required.

How does EN 9100 audit preparation work with your tool?

All data is centralized and automatically traced. The audit trail is generated in real time: you go from 3-5 days of preparation to a few hours of verification.

What is the cost of such a solution?

We offer two modes of engagement: SaaS solutions with a monthly subscription adapted to your size, and technical staffing with consultants embedded in your teams. Return on investment is typically achieved within 6 to 12 months.

Ready to transform
your aeronautics traceability?

Free audit of your processes within 48 hours. Our experts analyze your needs and propose a tailored solution.

Contact us →